Two-machine group scheduling problem with blocking and anticipatory setups (Q1309970): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 2 users not shown)
Property / author
 
Property / author: Chelliah Skriskandarajah / rank
Normal rank
 
Property / author
 
Property / author: Chelliah Skriskandarajah / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / cites work
 
Property / cites work: A graph partitioning procedure for machine assignment and cell formation in group technology† / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Heuristic Algorithm for the <i>n</i> Job, <i>m</i> Machine Sequencing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: ZODIAC—an algorithm for concurrent formation of part-families and machine-cells / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Complexity of Flowshop and Jobshop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Grouping of parts and components in flexible manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop scheduling with limited temporary storage / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated design of cellular manufacturing systems in the presence of alternative process plans / rank
 
Normal rank
Property / cites work
 
Property / cites work: On non-permutation solutions to some two machine flow shop scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing n jobs on two machines with setup, processing and removal times separated / rank
 
Normal rank
Property / cites work
 
Property / cites work: A method for finding minimal bottle-neck cells for grouping part-machine families† / rank
 
Normal rank

Latest revision as of 11:06, 22 May 2024

scientific article
Language Label Description Also known as
English
Two-machine group scheduling problem with blocking and anticipatory setups
scientific article

    Statements

    Two-machine group scheduling problem with blocking and anticipatory setups (English)
    0 references
    6 January 1994
    0 references
    flowshop
    0 references
    two-machine group scheduling
    0 references
    makespan
    0 references
    just-in-time manufacturing
    0 references
    NP-hard
    0 references
    heuristic
    0 references
    worst-case performance
    0 references

    Identifiers