Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problems (Q4399027): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207549508904795 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2067406684 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A cyclical scheduling heuristic for lot sizing with capacity constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Computational Complexity of the Capacitated Lot Size Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Economic Lot Scheduling Problem (ELSP): Review and Extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Review of Production Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some Extensions of the Discrete Lotsizing and Scheduling Problem / rank
 
Normal rank

Latest revision as of 13:25, 28 May 2024

scientific article; zbMATH DE number 1179717
Language Label Description Also known as
English
Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problems
scientific article; zbMATH DE number 1179717

    Statements

    Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problems (English)
    0 references
    17 May 1999
    0 references
    0 references
    log sizing
    0 references
    lot sequencing
    0 references
    capacitated production system
    0 references
    cycle scheduling
    0 references
    0 references