A real-time dynamic lot-sizing heuristic for a manufacturing system subject to random setup times (Q4230170): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207549608904987 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2032604322 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3795523 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Economic Lot Scheduling Problem (ELSP): Review and Extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: The discrete lot-sizing and scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Review of Production Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic Version of the Economic Lot Size Model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Efficient heuristics for dynamic lot sizing / rank
 
Normal rank

Latest revision as of 18:47, 28 May 2024

scientific article; zbMATH DE number 1256501
Language Label Description Also known as
English
A real-time dynamic lot-sizing heuristic for a manufacturing system subject to random setup times
scientific article; zbMATH DE number 1256501

    Statements