Evaluating capacity change and setup time reduction in a capacity-constrained, joint lot sizing situation (Q4230188): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207549608905001 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2080464679 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5724367 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Investing in Reduced Setups in the EOQ Model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 17:47, 28 May 2024

scientific article; zbMATH DE number 1256514
Language Label Description Also known as
English
Evaluating capacity change and setup time reduction in a capacity-constrained, joint lot sizing situation
scientific article; zbMATH DE number 1256514

    Statements

    Evaluating capacity change and setup time reduction in a capacity-constrained, joint lot sizing situation (English)
    0 references
    0 references
    0 references
    0 references
    1 March 1999
    0 references
    capacity-constrained
    0 references
    joint lot sizing
    0 references
    order quantity
    0 references
    order cycle
    0 references
    capacity change
    0 references

    Identifiers