Group technology approach to the open shop scheduling problem with batch setup times (Q1577474): Difference between revisions
From MaRDI portal
Set profile property. |
ReferenceBot (talk | contribs) Changed an Item |
||
Property / cites work | |||
Property / cites work: Approximation algorithms for two-machine flow shop scheduling with batch setup times / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Open Shop Scheduling to Minimize Finish Time / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Two-machine shop scheduling problems with batch processing / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q3995531 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Two machine open shop scheduling problem with setup, processing and removal times separated / rank | |||
Normal rank |
Revision as of 13:41, 30 May 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Group technology approach to the open shop scheduling problem with batch setup times |
scientific article |
Statements
Group technology approach to the open shop scheduling problem with batch setup times (English)
0 references
22 November 2000
0 references
open shop
0 references
batching
0 references
group technology
0 references
approximation
0 references