Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times (Q1781549): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2004.04.001 / rank
Normal rank
 
Property / OpenAlex ID
 
Property / OpenAlex ID: W2117987000 / rank
Normal rank
 
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2004.04.001 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2117987000 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4124332 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the makespan on a batch machine with non-identical job sizes: An exact procedure / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4789914 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness / rank
 
Normal rank
Property / cites work
 
Property / cites work: The use of upstream and downstream information in scheduling semiconductor batch operations / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new dynamic look-ahead scheduling procedure for batching machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stochastic scheduling of a batch processing machine with incompatible job families / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new dominance rule to minimize total weighted tardiness with unequal release dates. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4873721 / rank
 
Normal rank

Latest revision as of 13:00, 10 June 2024

scientific article
Language Label Description Also known as
English
Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
scientific article

    Statements

    Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    27 June 2005
    0 references
    0 references
    Scheduling
    0 references
    Batching
    0 references
    Parallel machines
    0 references
    Genetic algorithms
    0 references
    Semiconductor manufacturing
    0 references
    0 references
    0 references
    0 references