Two-machine shop scheduling: Compromise between flexibility and makespan value (Q2566711): Difference between revisions

From MaRDI portal
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(4 intermediate revisions by 3 users not shown)
Property / author
 
Property / author: Carl Esswein / rank
Normal rank
 
Property / author
 
Property / author: Carl Esswein / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2004.01.029 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1973788172 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new method for workshop real time scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Technical Note—Finding Some Essential Characteristics of the Feasible Solutions for a Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling Batches with Sequential Job Processing for Two-Machine Flow and Open Shops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Open Shop Scheduling to Minimize Finish Time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project scheduling under uncertainty: survey and research potentials / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new fully polynomial time approximation scheme for the Knapsack problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic Programming and Strong Bounds for the 0-1 Knapsack Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3964013 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with batching: A review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling manufacturing systems: A framework of strategies, policies, and methods / rank
 
Normal rank

Latest revision as of 15:56, 10 June 2024

scientific article
Language Label Description Also known as
English
Two-machine shop scheduling: Compromise between flexibility and makespan value
scientific article

    Statements

    Two-machine shop scheduling: Compromise between flexibility and makespan value (English)
    0 references
    0 references
    0 references
    0 references
    28 September 2005
    0 references
    Scheduling
    0 references
    Flexibility
    0 references
    Robustness
    0 references
    Flow shop
    0 references
    Job shop
    0 references
    Open shop
    0 references

    Identifiers