Sequency on two and three machines with setup, processing and removal times separated (Q3664805): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207548308942406 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2014916545 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing <i>n</i> Jobs on Two Machines with Arbitrary Time Lags / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mathematical aspects of the 3 × n job-shop sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Two-Machine Orderings in the 3 × <i>n</i> Flow-Shop Problem / rank
 
Normal rank

Latest revision as of 08:47, 14 June 2024

scientific article
Language Label Description Also known as
English
Sequency on two and three machines with setup, processing and removal times separated
scientific article

    Statements

    Sequency on two and three machines with setup, processing and removal times separated (English)
    0 references
    0 references
    0 references
    1983
    0 references
    algorithms
    0 references
    optimal sequence
    0 references
    sequencing
    0 references
    setup time
    0 references
    processing time
    0 references
    removal time
    0 references
    completion time
    0 references
    three machine problem
    0 references
    decision rules
    0 references
    optimum solution
    0 references

    Identifiers