Two-way eyeballing heuristics in dynamic lot sizing with backlogging (Q909568): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic Version of the Economic Lot Size Model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two Modifications Of The Silver-Meal Lot Sizing Heuristic / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Deterministic Multi-Period Production Scheduling Model with Backlogging / rank
 
Normal rank
Property / cites work
 
Property / cites work: Eyeballing heuristics for dynamic lot size problems / rank
 
Normal rank

Latest revision as of 13:33, 20 June 2024

scientific article
Language Label Description Also known as
English
Two-way eyeballing heuristics in dynamic lot sizing with backlogging
scientific article

    Statements

    Two-way eyeballing heuristics in dynamic lot sizing with backlogging (English)
    0 references
    0 references
    0 references
    1990
    0 references
    0 references
    heuristic algorithms
    0 references
    discrete dynamic lot size problems
    0 references
    backlogging
    0 references
    computational results
    0 references