Two-way eyeballing heuristics in dynamic lot sizing with backlogging (Q909568): Difference between revisions
From MaRDI portal
Added link to MaRDI item. |
ReferenceBot (talk | contribs) Changed an Item |
||
(One intermediate revision by one other user not shown) | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Dynamic Version of the Economic Lot Size Model / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Two Modifications Of The Silver-Meal Lot Sizing Heuristic / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A Deterministic Multi-Period Production Scheduling Model with Backlogging / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Eyeballing heuristics for dynamic lot size problems / rank | |||
Normal rank |
Latest revision as of 13:33, 20 June 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Two-way eyeballing heuristics in dynamic lot sizing with backlogging |
scientific article |
Statements
Two-way eyeballing heuristics in dynamic lot sizing with backlogging (English)
0 references
1990
0 references
heuristic algorithms
0 references
discrete dynamic lot size problems
0 references
backlogging
0 references
computational results
0 references