The constrained minimum weighted sum of job completion times problem (Q2494511): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10107-005-0691-3 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2153966571 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4252370 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Slowing down sorting networks to obtain faster sorting algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-Dimensional Gantt Charts and a Scheduling Algorithm of Lawler / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximation Schemes for the Restricted Shortest Path Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Strongly polynomial-time approximation for a class of bicriteria problems. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bicriteria Network Design Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling <i>n</i> Independent Jobs on <i>m</i> Uniform Machines with both Flowtime and Makespan Objectives: A Parametric Analysis / rank
 
Normal rank
Property / cites work
 
Property / cites work: Combinatorial Optimization with Rational Objective Functions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Structure of a simple scheduling polyhedron / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-Machine Scheduling Polyhedra with Precedence Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4829007 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An approximation algorithm for the generalized assignment problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the existence of schedules that are near-optimal for both makespan and total weighted completion time / rank
 
Normal rank

Latest revision as of 16:31, 24 June 2024

scientific article
Language Label Description Also known as
English
The constrained minimum weighted sum of job completion times problem
scientific article

    Statements

    The constrained minimum weighted sum of job completion times problem (English)
    0 references
    0 references
    0 references
    28 June 2006
    0 references
    Scheduling
    0 references
    Combinatorial optimization
    0 references
    Approximation scheme
    0 references

    Identifiers