A multi-objective lead time control problem in multistage assembly systems using an interactive method (Q2495993): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Modelling complex assemblies as a queueing network for lead time control / rank
 
Normal rank
Property / cites work
 
Property / cites work: Distribution function of the shortest path in networks of queues / rank
 
Normal rank
Property / cites work
 
Property / cites work: Survey of scheduling research involving due date determination decisions / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Markovian single server with upstream job and downstream demand arrival stream / rank
 
Normal rank
Property / cites work
 
Property / cites work: Assembly-like queues / rank
 
Normal rank
Property / cites work
 
Property / cites work: Performance analysis and buffer allocations in some open assembly systems. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiple objective decision making - methods and applications. A state- of-the-art survey. In collaboration with Sudhakar R. Paidy and Kwangsun Yoon / rank
 
Normal rank
Property / cites work
 
Property / cites work: Steady state waiting time in a multicenter job shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Markov and Markov-Regenerative <scp>pert</scp> Networks / rank
 
Normal rank
Property / cites work
 
Property / cites work: Assembly-like queues with finite capacity: Bounds, asymptotics and approximations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Performance analysis of a kitting process in stochastic assembly systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Due Date Assignment for Production Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3959003 / rank
 
Normal rank

Latest revision as of 16:47, 24 June 2024

scientific article
Language Label Description Also known as
English
A multi-objective lead time control problem in multistage assembly systems using an interactive method
scientific article

    Statements

    A multi-objective lead time control problem in multistage assembly systems using an interactive method (English)
    0 references
    0 references
    0 references
    30 June 2006
    0 references
    multiple objective programming
    0 references
    production
    0 references
    numerical example
    0 references
    multistage assembly system
    0 references
    queueing network
    0 references
    manufacturing
    0 references
    Poisson process
    0 references
    optimal control
    0 references
    STEM method
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references