Modeling of period overlapping setup times (Q2503060): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2005.03.033 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2109270409 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Changeover Scheduling Problem with Time and Cost Considerations: Analytical Results and a Forward Algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Dual Ascent and Column Generation Heuristic for the Discrete Lotsizing and Scheduling Problem with Setup Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: The discrete lot-sizing and scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lotsizing and scheduling for production planning / rank
 
Normal rank
Property / cites work
 
Property / cites work: An effective heuristic for the CLSP with set-up times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiperiod production planning carrying over set-up time / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Capacitated Lot-Sizing Problem with Linked Lot Sizes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4054818 / rank
 
Normal rank
Property / cites work
 
Property / cites work: From EOQ Towards ZI / rank
 
Normal rank

Latest revision as of 19:18, 24 June 2024

scientific article
Language Label Description Also known as
English
Modeling of period overlapping setup times
scientific article

    Statements

    Identifiers