Different behaviour of a double branch-and-bound algorithm on \(\mathrm {Fm}|\mathrm{prmu}|C_{\max}\) and \(\mathrm {Fm}|\mathrm {block}|C_{\max}\) problems (Q856670): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2005.05.018 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1843322475 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3995531 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Complexity of Flowshop and Jobshop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: An adaptive branching rule for the permutation flow-shop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two branch and bound algorithms for the permutation flow shop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Note on an improved branch-and-bound algorithm to solve \(n/m/P/F_{\text{max}}\) problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Development of <i>M</i>-Stage Decision Rule for Scheduling N Jobs Through <i>M</i> Machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Heuristic Algorithm for the <i>n</i> Job, <i>m</i> Machine Sequencing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Functional Heuristic Algorithm for the Flowshop Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Evaluation of Flow Shop Sequencing Heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: A computational study of the permutation flow shop problem based on a tight lower bound / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimising Maximum Lateness in a Two-Machine Flowshop / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-bound-based local search method for the flow shop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Benchmarks for basic scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the Flow-Shop Sequencing Problem with No Wait in Process<sup>†</sup> / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3768703 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop scheduling with limited temporary storage / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing in an Assembly Line with Blocking to Minimize Cycle Time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop sequencing problems with limited buffer storage / rank
 
Normal rank
Property / cites work
 
Property / cites work: A high quality solution constructive heuristic for flow shop sequencing / rank
 
Normal rank
Property / cites work
 
Property / cites work: A General Bounding Scheme for the Permutation Flow-Shop Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lower bounding schemes for flowshops with blocking in-process / rank
 
Normal rank

Latest revision as of 10:24, 25 June 2024

scientific article
Language Label Description Also known as
English
Different behaviour of a double branch-and-bound algorithm on \(\mathrm {Fm}|\mathrm{prmu}|C_{\max}\) and \(\mathrm {Fm}|\mathrm {block}|C_{\max}\) problems
scientific article

    Statements

    Different behaviour of a double branch-and-bound algorithm on \(\mathrm {Fm}|\mathrm{prmu}|C_{\max}\) and \(\mathrm {Fm}|\mathrm {block}|C_{\max}\) problems (English)
    0 references
    0 references
    0 references
    7 December 2006
    0 references
    scheduling
    0 references
    permutation flow-shop
    0 references
    blocking flow-shop
    0 references
    double branch-and-bound algorithm
    0 references
    0 references
    0 references

    Identifiers