A heuristic for the long-term electricity generation planning problem using the Bloom and Gallant formulation (Q877611): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2005.10.070 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2092192562 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Decomposition Principle for Linear Programs / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Suggested Computation for Maximal Multi-Commodity Network Flows / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4739659 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Warm start of the primal-dual method applied in the cutting-plane scheme / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5691079 / rank
 
Normal rank

Latest revision as of 18:23, 25 June 2024

scientific article
Language Label Description Also known as
English
A heuristic for the long-term electricity generation planning problem using the Bloom and Gallant formulation
scientific article

    Statements

    A heuristic for the long-term electricity generation planning problem using the Bloom and Gallant formulation (English)
    0 references
    0 references
    0 references
    3 May 2007
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    energy
    0 references
    heuristics
    0 references
    large scale optimization
    0 references
    quadratic programming
    0 references
    stochastic programming
    0 references
    0 references
    0 references
    0 references