A note on the two machine job shop with the weighted late work criterion (Q880589): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Removed claims
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / author
 
Property / author: Jacek Błażewicz / rank
 
Normal rank
Property / author
 
Property / author: Frank Werner / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10951-006-0005-5 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2119760838 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3680271 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing mean weighted execution time loss on identical and uniform processors / rank
 
Normal rank
Property / cites work
 
Property / cites work: Open shop scheduling problems with late work criteria. / rank
 
Normal rank
Property / cites work
 
Property / cites work: The two-machine flow-shop problem with weighted late work criterion and common due date / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4396949 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling shops to minimize the weighted number of late jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5485395 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single Machine Scheduling to Minimize Total Late Work / rank
 
Normal rank

Latest revision as of 19:09, 25 June 2024

scientific article
Language Label Description Also known as
English
A note on the two machine job shop with the weighted late work criterion
scientific article

    Statements

    A note on the two machine job shop with the weighted late work criterion (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    15 May 2007
    0 references
    0 references
    Dynamic programming
    0 references
    Job-shop scheduling problem
    0 references
    Late work criterion
    0 references
    Scheduling
    0 references
    0 references
    0 references