A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness (Q5431617): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207160701331376 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2022297072 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiple and bicriteria scheduling: A literature survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Heuristic Algorithm for the <i>n</i> Job, <i>m</i> Machine Sequencing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total tardiness in permutation flowshops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3970631 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The two- and \(m\)-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime / rank
 
Normal rank
Property / cites work
 
Property / cites work: Greedy randomized adaptive search procedures / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q2776548 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A greedy randomized adaptive search procedure for the feedback vertex set problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Semi-greedy heuristics: An empirical study / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Benchmarks for basic scheduling problems / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 13:07, 27 June 2024

scientific article; zbMATH DE number 5219656
Language Label Description Also known as
English
A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
scientific article; zbMATH DE number 5219656

    Statements

    A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness (English)
    0 references
    0 references
    0 references
    0 references
    12 December 2007
    0 references
    flow shop
    0 references
    makespan
    0 references
    GRASP algorithm
    0 references
    metaheuristic
    0 references

    Identifiers