A 3/2-Approximation for the Proportionate Two-Machine Flow Shop Scheduling with Minimum Delays (Q5443372): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/978-3-540-77918-6_5 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2131385779 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximation algorithms for UET scheduling problems with exact delays / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximation Algorithms for Scheduling Problems with Exact Delays / rank
 
Normal rank
Property / cites work
 
Property / cites work: Shop Problems With Two Machines and Time Lags / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing <i>n</i> Jobs on Two Machines with Arbitrary Time Lags / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic for the two-machine open-shop scheduling problem with transportation times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4884350 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 17:25, 27 June 2024

scientific article; zbMATH DE number 5237483
Language Label Description Also known as
English
A 3/2-Approximation for the Proportionate Two-Machine Flow Shop Scheduling with Minimum Delays
scientific article; zbMATH DE number 5237483

    Statements