Selection, acquisition, and allocation of manufacturing technology in a multi-period environment (Q2482756): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2006.11.046 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2081349988 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Approximation Scheme for Stochastic Integer Programs Arising in Capacity Expansion / rank
 
Normal rank
Property / cites work
 
Property / cites work: Capacity Acquisition, Subcontracting, and Lot Sizing / rank
 
Normal rank
Property / cites work
 
Property / cites work: The capacity expansion problem in the service industry / rank
 
Normal rank
Property / cites work
 
Property / cites work: Computational Complexity of the Capacitated Lot Size Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lower Bounding Procedures for Multiperiod Telecommunications Network Expansion Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Investment in Product-Flexible Manufacturing Capacity / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Multiregion Dynamic Capacity Expansion Problem, Part II / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4040329 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3994459 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Models for petroleum field exploitation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Time Step vs. Dynamic Optimization of Generation-Capacity-Expansion Programs of Power Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic Capacity Expansion Problem with Multiple Products: Technology Selection and Timing of Capacity Additions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results / rank
 
Normal rank
Property / cites work
 
Property / cites work: Capacity expansion with alternative technology choices / rank
 
Normal rank

Latest revision as of 22:11, 27 June 2024

scientific article
Language Label Description Also known as
English
Selection, acquisition, and allocation of manufacturing technology in a multi-period environment
scientific article

    Statements

    Selection, acquisition, and allocation of manufacturing technology in a multi-period environment (English)
    0 references
    0 references
    0 references
    24 April 2008
    0 references
    0 references
    0 references
    0 references
    0 references
    integer programming
    0 references
    technology selection
    0 references
    capacity expansion
    0 references
    heuristics
    0 references
    probabilistic analysis
    0 references
    0 references