A methodology for cutting-tool management through the integration of CAPP and scheduling (Q5385471): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(4 intermediate revisions by 4 users not shown)
Property / describes a project that uses
 
Property / describes a project that uses: CAPP / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207540600898049 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1999528579 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Auxiliary tool allocation in flexible manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic procedures for the parallel machine problem with tool switches / rank
 
Normal rank
Property / cites work
 
Property / cites work: General information model for representing machining features in CAPP systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A part-and-tool assignment method for the workload-balance between machines and the minimisation of tool-shortage occurrences in an FMS / rank
 
Normal rank
Property / cites work
 
Property / cites work: Estimation of tool requirements in single-stage multimachine systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal tool replacement and resetting strategies in automated manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches / rank
 
Normal rank
Property / cites work
 
Property / cites work: Non-identical parallel CNC machine scheduling / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 09:30, 28 June 2024

scientific article; zbMATH DE number 5271440
Language Label Description Also known as
English
A methodology for cutting-tool management through the integration of CAPP and scheduling
scientific article; zbMATH DE number 5271440

    Statements

    A methodology for cutting-tool management through the integration of CAPP and scheduling (English)
    0 references
    6 May 2008
    0 references
    0 references
    tool management
    0 references
    CAPP
    0 references
    scheduling
    0 references
    flexible manufacturing systems
    0 references
    0 references