Real time distributed shop floor scheduling using an agent-based service-oriented architecture (Q5385483): Difference between revisions
From MaRDI portal
Added link to MaRDI item. |
ReferenceBot (talk | contribs) Changed an Item |
||
(2 intermediate revisions by 2 users not shown) | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W1974497129 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A Survey of Scheduling Rules / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A loading and dispatching problem in a random flexible manufacturing system / rank | |||
Normal rank |
Latest revision as of 09:30, 28 June 2024
scientific article; zbMATH DE number 5271448
Language | Label | Description | Also known as |
---|---|---|---|
English | Real time distributed shop floor scheduling using an agent-based service-oriented architecture |
scientific article; zbMATH DE number 5271448 |
Statements
Real time distributed shop floor scheduling using an agent-based service-oriented architecture (English)
0 references
6 May 2008
0 references
shop floor scheduling
0 references
distributed control structure
0 references
dynamic distributed scheduling algorithms
0 references
agent-based service oriented integration
0 references