Multiple colony ant algorithm for job-shop scheduling problem (Q3518511): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / describes a project that uses
 
Property / describes a project that uses: OR-Library / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207540600990432 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1976394521 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Beam-ACO--hybridizing ant colony optimization with beam search: an application to open shop scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: An ant colony optimization algorithm for shop scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic / rank
 
Normal rank
Property / cites work
 
Property / cites work: Deterministic job-shop scheduling: Past, present and future / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some new results on simulated annealing applied to the job shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A novel threshold accepting meta-heuristic for the job-shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Fast Taboo Search Algorithm for the Job Shop Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An advanced tabu search algorithm for the job shop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A tabu search method guided by shifting bottleneck for the job shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A knowledge-based evolutionary strategy for scheduling problems with bottlenecks / rank
 
Normal rank
Property / cites work
 
Property / cites work: An effective hybrid optimization strategy for job-shop scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: An ant colony system for permutation flow-shop sequencing / rank
 
Normal rank

Latest revision as of 13:21, 28 June 2024

scientific article
Language Label Description Also known as
English
Multiple colony ant algorithm for job-shop scheduling problem
scientific article

    Statements

    Multiple colony ant algorithm for job-shop scheduling problem (English)
    0 references
    8 August 2008
    0 references
    job-shop scheduling problem
    0 references
    multiple colony ant algorithm
    0 references
    metaheuristic
    0 references
    local search
    0 references

    Identifiers