Economic design of integrated model of control chart and maintenance management (Q949508): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.mcm.2007.09.008 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2049881355 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4279262 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Effect of maintenance on the economic design of \(\overline x\)-control chart / rank
 
Normal rank
Property / cites work
 
Property / cites work: Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products / rank
 
Normal rank
Property / cites work
 
Property / cites work: An integrated systems approach to process control and maintenance / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal preventive maintenance for equipment with two quality states and general failure time distributions / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Economic Design of | barX Charts used to Maintain Current Control of a Process / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Revision as of 17:40, 28 June 2024

scientific article
Language Label Description Also known as
English
Economic design of integrated model of control chart and maintenance management
scientific article

    Statements

    Identifiers