Lagrangean relaxation based heuristics for lot sizing with setup times (Q953424): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: Single item lot sizing problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analysis of relaxations for the multi-item capacitated lot-sizing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Equivalence of the LP relaxations of two strong formulations for the capacitated lot-sizing problem with setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: On alternative mixed integer programming formulations and LP-based heuristics for lot-sizing with setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Capacitated lot-sizing and scheduling by Lagrangean relaxation / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Fully Polynomial Approximation Scheme for Single-Product Scheduling in a Finite Capacity Facility / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improved lower bounds for the capacitated lot sizing problem with setup times. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot Sizes, Lead Times and In-Process Inventories / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4139966 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5630824 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Primal-dual approach to the single level capacitated lot-sizing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multilevel capacitated lotsizing complexity and LP-based heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production Planning by Mixed Integer Programming / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic Version of the Economic Lot Size Model / rank
 
Normal rank

Latest revision as of 19:54, 28 June 2024

scientific article
Language Label Description Also known as
English
Lagrangean relaxation based heuristics for lot sizing with setup times
scientific article

    Statements

    Lagrangean relaxation based heuristics for lot sizing with setup times (English)
    0 references
    0 references
    0 references
    0 references
    20 November 2008
    0 references
    inventory
    0 references
    setup time
    0 references
    reformulation
    0 references
    Lagrangean relaxation
    0 references
    heuristic
    0 references

    Identifiers