Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals (Q958115): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2008.01.033 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2010061772 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Satisfiability tests and time-bound adjustments for cumulative scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Constraint-based scheduling: Applying constraint programming to scheduling problems. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal control for systems with deterministic production cycles / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal control of failure-prone manufacturing systems with constant repair times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling multiple part-types in an unreliable single-machine manufacturing system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Failure-prone production systems with uncertain demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal PHP production of multiple part-types on a failure-prone machine with quadratic buffer costs / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 21:54, 28 June 2024

scientific article
Language Label Description Also known as
English
Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals
scientific article

    Statements

    Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals (English)
    0 references
    0 references
    0 references
    2 December 2008
    0 references
    0 references
    failure-prone systems
    0 references
    cumulative resources
    0 references
    0 references