Minimizing makespan in two-stage hybrid cross docking scheduling problem (Q1001000): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(4 intermediate revisions by 4 users not shown)
Property / describes a project that uses
 
Property / describes a project that uses: CPLEX / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2008.07.003 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2088252115 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3609943 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3995531 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling of flexible flow lines in an automobile assembly plant / rank
 
Normal rank
Property / cites work
 
Property / cites work: Branch and bound algorithm for the flow shop with multiple processors / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling algorithms for flexible flowshops: Worst and average case performance / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan in hybrid flowshops / rank
 
Normal rank
Property / cites work
 
Property / cites work: A flowshop scheduling problem with two operations per job / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recircu\-lation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling realistic hybrid flexible flowshop scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Experimental evaluation of heuristic optimization algorithms: A tutorial / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 02:10, 29 June 2024

scientific article
Language Label Description Also known as
English
Minimizing makespan in two-stage hybrid cross docking scheduling problem
scientific article

    Statements

    Minimizing makespan in two-stage hybrid cross docking scheduling problem (English)
    0 references
    0 references
    0 references
    12 February 2009
    0 references
    0 references
    machine scheduling
    0 references
    logistics
    0 references
    cross docking
    0 references
    0 references