Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties (Q1027605): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2008.09.001 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2055951538 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The elixir of life: using a maintenance, repair and replacement model based on virtual and operating age in the water industry / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hedging point policy improvement / rank
 
Normal rank
Property / cites work
 
Property / cites work: Manufacturing flow control and preventing maintenance: a stochastic control approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production/maintenance cooperative scheduling using multi-agents and fuzzy logic / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analytical Evaluation of Hierarchical Planning Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some results for repairable systems with general repair / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4004190 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A fuzzy logic approach to an integrated maintenance/production scheduling algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: A discrete semi-Markov decision model to determine the optimal repair/replace- ment policy under general repairs / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on optimal replacement policy under general repair / rank
 
Normal rank
Property / cites work
 
Property / cites work: Replacement policies for a cumulative damage model with minimal repair at failure / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Policy for Minimal Repair / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4265503 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3824084 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Decision making in industrial production planning using fuzzy linear programming / rank
 
Normal rank
Property / cites work
 
Property / cites work: A numerical method in optimal production and setup scheduling of stochastic manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4255599 / rank
 
Normal rank

Latest revision as of 17:56, 1 July 2024

scientific article
Language Label Description Also known as
English
Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties
scientific article

    Statements

    Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties (English)
    0 references
    0 references
    0 references
    0 references
    30 June 2009
    0 references
    0 references
    manufacturing systems
    0 references
    numerical methods
    0 references
    optimal control
    0 references
    production planning
    0 references
    imperfect repairs
    0 references
    damage failures
    0 references
    replacement
    0 references
    0 references