Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration (Q840154): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.apm.2008.01.013 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2036869053 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling Groups of Jobs on a Single Machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with batching: A review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batching and Scheduling Jobs on Batch and Discrete Processors / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with transportation considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Makespan minimization for flow-shop problems with transportation times and a single robot / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complexity of flow shop scheduling problems with transportation constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with deliveries to multiple customer locations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with time dependent processing times: Review and extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: A concise survey of scheduling with time-dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling jobs under simple linear deterioration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complexity analysis of job-shop scheduling with deteriorating jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5047629 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total tardiness in a scheduling problem with a learning effect / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Efficient scheduling algorithms for a single batch processing machine / rank
 
Normal rank

Latest revision as of 23:27, 1 July 2024

scientific article
Language Label Description Also known as
English
Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration
scientific article

    Statements

    Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration (English)
    0 references
    0 references
    0 references
    5 September 2009
    0 references
    0 references
    flowshop scheduling
    0 references
    batching machine
    0 references
    transportation
    0 references
    deterioration
    0 references
    heuristic
    0 references
    0 references