Double layer ACO algorithm for the multi-objective FJSSP (Q732169): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s00354-008-0048-6 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2013720120 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some new results on simulated annealing applied to the job shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A tabu search method guided by shifting bottleneck for the job shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An efficient genetic algorithm for job shop scheduling with tardiness objectives. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid genetic algorithm for the job shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Ant colony optimization combined with taboo search for the job shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An alternative framework to Lagrangian relaxation approach for job shop scheduling. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A structural design of decision support systems for deteriorating repairable systems. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximation schemes for job shop scheduling problems with controllable processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Job-shop scheduling with multi-purpose machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Routing and scheduling in a flexible job shop by tabu search / rank
 
Normal rank
Property / cites work
 
Property / cites work: Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu search for the job-shop scheduling problem with multi-purpose machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Effective neighbourhood functions for the flexible job shop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search / rank
 
Normal rank
Property / cites work
 
Property / cites work: Quantifiers in the formulation of multiple objective decision functions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5480099 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An effective architecture for learning and evolving flexible job-shop schedules / rank
 
Normal rank

Latest revision as of 01:18, 2 July 2024

scientific article
Language Label Description Also known as
English
Double layer ACO algorithm for the multi-objective FJSSP
scientific article

    Statements

    Double layer ACO algorithm for the multi-objective FJSSP (English)
    0 references
    0 references
    0 references
    0 references
    9 October 2009
    0 references
    0 references
    0 references
    0 references
    0 references
    combinatorial optimization
    0 references
    ant colony optimization
    0 references
    multi-objective optimization
    0 references
    flexible job shop scheduling
    0 references
    scheduling knowledge
    0 references
    0 references
    0 references