Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine (Q1037662): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2009.03.018 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2156976424 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for the two-stage job shop scheduling problem with a bottleneck machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling shops to minimize the weighted number of late jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Solvable Case of the One-Machine Scheduling Problem with Ready and Due Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flow shop and open shop scheduling with a critical machine and two operations per job / rank
 
Normal rank
Property / cites work
 
Property / cites work: The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-stage flowshop scheduling with a common second-stage machine / rank
 
Normal rank

Latest revision as of 05:03, 2 July 2024

scientific article
Language Label Description Also known as
English
Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine
scientific article

    Statements

    Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine (English)
    0 references
    0 references
    0 references
    16 November 2009
    0 references
    0 references
    scheduling
    0 references
    flow-shop
    0 references
    weighted number of tardy jobs
    0 references
    critical machine
    0 references
    0 references