Due dates assignment and JIT scheduling with equal-size jobs (Q976442): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2010.01.016 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1990496452 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Fast and Simple Algorithm for the Maximum Flow Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing with Earliness and Tardiness Penalties: A Review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel-Machine Scheduling Problems with Earliness and Tardiness Penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: Theoretical Improvements in Algorithmic Efficiency for Network Flow Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new approach to the maximum-flow problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of the state-of-the-art of common due date assignment and scheduling research / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4667087 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Just-in-time scheduling. Models and algorithms for computer and manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5519710 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing weighted earliness-tardiness and due-date cost with unit processing-time jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Due-date assignment on uniform machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multicriteria scheduling problems: a survey / rank
 
Normal rank

Latest revision as of 22:44, 2 July 2024

scientific article
Language Label Description Also known as
English
Due dates assignment and JIT scheduling with equal-size jobs
scientific article

    Statements

    Due dates assignment and JIT scheduling with equal-size jobs (English)
    0 references
    0 references
    0 references
    11 June 2010
    0 references
    0 references
    multi-processor scheduling
    0 references
    due dates assignment
    0 references
    earliness-tardiness penalty
    0 references
    polynomial-time algorithms
    0 references
    0 references