Estimating Process Capability Index<i>C</i><sub><i>PM</i></sub>Using a Bootstrap Sequential Sampling Procedure (Q3589991): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/03610911003790114 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2002964069 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A three-stage procedure based on bootstrap critical points / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the asymptotic distributions of some process capability indices. / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the Non-Existence of Tests of "Student's" Hypothesis Having Power Functions Independent of $\sigma$ / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bootstrap methods: another look at the jackknife / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3959963 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4717648 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A consistent and asymptotically efficient two-stage procedure to construct fixed width confidence intervals for the mean / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequential Methods and Their Applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: The bootstrap: To smooth or not to smooth? / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Two-Sample Test for a Linear Hypothesis Whose Power is Independent of the Variance / rank
 
Normal rank
Property / cites work
 
Property / cites work: Inference on the capability index:<i>Cpm</i> / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fixed width confidence intervals based on bootstrap procedures / rank
 
Normal rank
Property / cites work
 
Property / cites work: Distribution and moments in simplified form for a general class of capability indices / rank
 
Normal rank

Latest revision as of 06:04, 3 July 2024

scientific article
Language Label Description Also known as
English
Estimating Process Capability Index<i>C</i><sub><i>PM</i></sub>Using a Bootstrap Sequential Sampling Procedure
scientific article

    Statements

    Estimating Process Capability Index<i>C</i><sub><i>PM</i></sub>Using a Bootstrap Sequential Sampling Procedure (English)
    0 references
    17 September 2010
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    bootstrapping
    0 references
    capability index
    0 references
    confidence intervals
    0 references
    two-stage sequential procedures
    0 references
    0 references