Optimising the Slab Yard Planning and Crane Scheduling Problem using a two-stage heuristic (Q3163219): Difference between revisions

From MaRDI portal
Set OpenAlex properties.
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: A survey of scheduling problems with setup times or costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained project scheduling: Notation, classification, models, and methods / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Advanced methods for container stacking / rank
 
Normal rank
Property / cites work
 
Property / cites work: Deriving decision rules to locate export containers in container yards / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solutions to Real-World Instances of PSPACE-Complete Stacking / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Cyclic Multi-Hoist Scheduling: A Mixed Integer Programming Approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Container terminal operation and operations research -- a classification and literature review / rank
 
Normal rank
Property / cites work
 
Property / cites work: An effective heuristic algorithm to minimise stack shuffles in selecting steel slabs from the slab yard for heating and rolling / rank
 
Normal rank

Latest revision as of 09:36, 3 July 2024

scientific article
Language Label Description Also known as
English
Optimising the Slab Yard Planning and Crane Scheduling Problem using a two-stage heuristic
scientific article

    Statements

    Optimising the Slab Yard Planning and Crane Scheduling Problem using a two-stage heuristic (English)
    0 references
    0 references
    0 references
    25 October 2010
    0 references
    0 references
    scheduling
    0 references
    optimisation
    0 references
    operational research
    0 references
    artificial intelligence
    0 references
    combinatorial optimisation
    0 references
    dynamic programming
    0 references
    routing
    0 references
    0 references