Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case study (Q3055316): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207540802010823 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2068065788 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An application of a multi-objective tabu search algorithm to a bicriteria flowshop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Genetic local search for multi-objective flowshop scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-objective tabu search for a single-machine scheduling problem with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bicriteria scheduling with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing tardy jobs in a two-stage hybrid flowshop / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bottleneck-focused scheduling for a hybrid flowshop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Local search algorithms for the multiprocessor flow shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for scheduling in flowshop with multiple objectives / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors — a case study / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties / rank
 
Normal rank

Latest revision as of 11:14, 3 July 2024

scientific article
Language Label Description Also known as
English
Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case study
scientific article

    Statements

    Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case study (English)
    0 references
    7 November 2010
    0 references
    0 references
    general flowshop
    0 references
    simulation
    0 references
    multi-objective optimisation
    0 references
    tabu search
    0 references
    interactive scheduling
    0 references
    0 references