Comparing the impact of different rescheduling strategies on the entropic-related complexity of manufacturing systems (Q3055368): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207540701871036 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2043911120 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Matchup Scheduling with Multiple Resources, Release Dates and Disruptions / rank
 
Normal rank
Property / cites work
 
Property / cites work: A learning-based methodology for dynamic scheduling in distributed manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Anytime heuristic schedule repair in manufacturing industry / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production scheduling/rescheduling in flexible manufacturing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improving shop floor control: an entropy model approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Predictable scheduling of a single machine with breakdowns and sensitive jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Advances on measuring the operational complexity of supplier-customer systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rescheduling manufacturing systems: A framework of strategies, policies, and methods / rank
 
Normal rank

Latest revision as of 11:15, 3 July 2024

scientific article
Language Label Description Also known as
English
Comparing the impact of different rescheduling strategies on the entropic-related complexity of manufacturing systems
scientific article

    Statements

    Comparing the impact of different rescheduling strategies on the entropic-related complexity of manufacturing systems (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    7 November 2010
    0 references
    0 references
    FMS
    0 references
    simulation
    0 references
    dynamic scheduling
    0 references
    rescheduling
    0 references
    lean manufacturing
    0 references
    manufacturing systems
    0 references
    0 references