Multi-level single machine lot-sizing and scheduling with zero lead times (Q621969): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2010.09.022 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2041413687 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integer-programming software systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modelling Practical Lot-Sizing Problems as Mixed-Integer Programs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solution approaches for the soft drink integrated production lot sizing and scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4664813 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lotsizing and scheduling for production planning / rank
 
Normal rank
Property / cites work
 
Property / cites work: Capacitated lot-sizing with sequence dependent setup costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-level, single-machine lot sizing and scheduling (with initial inventory) / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4349430 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some insights into proportional lot sizing and scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for multi-level, multi-machine lot sizing and scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Proportional lot sizing and scheduling: Some extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simultaneous lotsizing and scheduling by combining local search with dual reoptimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production Planning by Mixed Integer Programming / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: A general quantity discount and supplier selection mixed integer programming model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Time continuity in discrete time models. New approaches for production planning in process industries. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Campaign planning in time-indexed model formulations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling of period overlapping setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4254875 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 17:45, 3 July 2024

scientific article
Language Label Description Also known as
English
Multi-level single machine lot-sizing and scheduling with zero lead times
scientific article

    Statements

    Multi-level single machine lot-sizing and scheduling with zero lead times (English)
    0 references
    0 references
    31 January 2011
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    lot-sizing
    0 references
    scheduling
    0 references
    PLSP
    0 references
    bill of materials
    0 references
    lead time
    0 references
    0 references
    0 references
    0 references
    0 references