Level scheduling under limited resequencing flexibility (Q539476): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1965913855 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics and exact algorithms for solving the Monden problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing mixed-model assembly lines: survey, classification and model critique / rank
 
Normal rank
Property / cites work
 
Property / cites work: The product rate variation problem and its relevance in real world mixed-model assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: The maximum deviation just-in-time scheduling problem. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3436594 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving symmetric mixed-model multi-level just-in-time scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Least in-sequence probability heuristic for mixed-volume production lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: An $n^{5/2} $ Algorithm for Maximum Matchings in Bipartite Graphs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Note—Sequencing JIT Mixed-Model Assembly Lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing variation of production rates in just-in-time systems: A survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Cyclic just-in-time sequences are optimal / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems” / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal level schedules for mixed-model, multi-level just-in-time assembly systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Searching optimal resequencing and feature assignment on an automated assembly line / rank
 
Normal rank
Property / cites work
 
Property / cites work: Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Backtracking and exchange of information: Methods to enhance a beam search algorithm for assembly line scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A sequential ordering problem in automotive paint shops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Level Schedules for Mixed-Model, Just-in-Time Processes / rank
 
Normal rank

Latest revision as of 03:17, 4 July 2024

scientific article
Language Label Description Also known as
English
Level scheduling under limited resequencing flexibility
scientific article

    Statements

    Level scheduling under limited resequencing flexibility (English)
    0 references
    0 references
    0 references
    0 references
    30 May 2011
    0 references
    0 references
    mixed-model assembly line
    0 references
    just-in-time
    0 references
    level scheduling
    0 references
    re-sequencing
    0 references
    0 references
    0 references