A two-stage stochastic programming model for the parallel machine scheduling problem with machine capacity (Q547125): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(6 intermediate revisions by 5 users not shown)
Property / author
 
Property / author: Talal M. Al-Khamis / rank
Normal rank
 
Property / author
 
Property / author: Talal M. Al-Khamis / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: SUTIL / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2011.01.017 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1994160530 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5437769 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing with Earliness and Tardiness Penalties: A Review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stochastic scheduling on parallel machines to minimize discounted holding costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stochastic Scheduling on Parallel Machines Subject to Random Breakdowns to Minimize Expected Costs for Earliness and Tardy Jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving Parallel Machine Scheduling Problems by Column Generation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the number of tardy jobs for \(m\) parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machine scheduling to minimize costs for earliness and number of tardy jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Sample Average Approximation Method for Stochastic Discrete Optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Non-identical parallel-machine scheduling research with minimizing total weighted completion times: models, relaxations and algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the weighted number of tardy jobs on parallel processors / rank
 
Normal rank
Property / cites work
 
Property / cites work: Monte Carlo bounding techniques for determinig solution quality in stochastic programs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4546261 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with Deadlines and Loss Functions / rank
 
Normal rank
Property / cites work
 
Property / cites work: A stochastic programming approach for supply chain network design under uncertainty / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simulation-based approach to two-stage stochastic programming with recourse / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stochastic Machine Scheduling with Precedence Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel Machine Scheduling by Column Generation / rank
 
Normal rank
Property / cites work
 
Property / cites work: The sample average approximation method applied to stochastic routing problems: a computational study / rank
 
Normal rank
Property / cites work
 
Property / cites work: Experimental Comparison of Approximation Algorithms for Scheduling Unrelated Parallel Machines / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 06:37, 4 July 2024

scientific article
Language Label Description Also known as
English
A two-stage stochastic programming model for the parallel machine scheduling problem with machine capacity
scientific article

    Statements

    A two-stage stochastic programming model for the parallel machine scheduling problem with machine capacity (English)
    0 references
    0 references
    0 references
    30 June 2011
    0 references
    0 references
    parallel machine scheduling
    0 references
    weighted number of on-time jobs
    0 references
    stochastic programming
    0 references
    ranking and selection
    0 references
    average sample approximation
    0 references
    0 references
    0 references
    0 references
    0 references