Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line (Q3019223): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207543.2010.528061 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2066395794 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: An adaptive genetic algorithm approach for the mixed-model assembly line sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: GRASP with path relinking for a multiple objective sequencing problem for a mixed-model assembly line / rank
 
Normal rank
Property / cites work
 
Property / cites work: An analytic framework for sequencing mixed model assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing mixed-model assembly lines to level parts usage and minimize line length / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics and exact algorithms for solving the Monden problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for real-time scheduling of jobs on mixed model assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing mixed-model assembly lines: survey, classification and model critique / rank
 
Normal rank
Property / cites work
 
Property / cites work: Level scheduling of mixed-model assembly lines under storage constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: The product rate variation problem and its relevance in real world mixed-model assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing problem for a mixed-model assembly line in the Toyota production system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing variation of production rates in just-in-time systems: A survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Level schedules for mixed-model JIT production lines: characteristics of the largest instances that can be solved optimally / rank
 
Normal rank
Property / cites work
 
Property / cites work: The car sequencing problem: overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mixed-Model Sequencing to Minimize Utility Work and the Risk of Conveyor Stoppage / rank
 
Normal rank
Property / cites work
 
Property / cites work: Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bicriteria sequencing for just-in-time mixed-model assembly lines / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 08:59, 4 July 2024

scientific article
Language Label Description Also known as
English
Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line
scientific article

    Statements

    Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    27 July 2011
    0 references
    0 references
    0 references
    0 references
    0 references
    mixed-model assembly line
    0 references
    production sequencing
    0 references
    line stoppage
    0 references
    branch and bound algorithm
    0 references
    0 references