The dominance digraph as a solution to the two-machine flow-shop problem with interval processing times (Q3111147): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/02331931003657691 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2022805676 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine flowshop minimum-length scheduling problem with random and bounded processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Executing production schedules in the face of uncertainties: a review and some future directions / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new sufficient condition of optimality for the two-machine flowshop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing with uncertain numerical data for makespan minimisation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mean flow time minimization with given bounds of processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Necessary and sufficient conditions of optimality for some classical scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Schedule execution for two-machine flow-shop with interval processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A NEW FORMULATION AND RELAXATION OF THE SIMPLE PLANT LOCATION PROBLEM / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop scheduling problem to minimize total completion time with random and bounded processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total weighted flow time of a set of jobs with interval processing times / rank
 
Normal rank

Latest revision as of 21:09, 4 July 2024

scientific article
Language Label Description Also known as
English
The dominance digraph as a solution to the two-machine flow-shop problem with interval processing times
scientific article

    Statements

    The dominance digraph as a solution to the two-machine flow-shop problem with interval processing times (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    18 January 2012
    0 references
    0 references
    0 references
    0 references
    0 references
    scheduling
    0 references
    makespan
    0 references
    uncertainty
    0 references
    dominance relation
    0 references
    0 references
    0 references