Realistic two-stage flowshop batch scheduling problems with transportation capacity and times (Q2428924): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.apm.2011.07.011 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1981207682 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling Groups of Jobs on a Single Machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with batching: A review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Efficient scheduling algorithms for a single batch processing machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batching and Scheduling Jobs on Batch and Discrete Processors / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed / rank
 
Normal rank
Property / cites work
 
Property / cites work: Efficient Algorithms for Scheduling Semiconductor Burn-In Operations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan on a single burn-in oven in semiconductor manufacturing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with transportation considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling Parts in a Combined Production-transportation Work Cell / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3883869 / rank
 
Normal rank
Property / cites work
 
Property / cites work: ON AN AUTOMATED TWO-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on the complexity of flow shop scheduling with transportation constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complexity of flow shop scheduling problems with transportation constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated Scheduling of Production and Distribution Operations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Logistics scheduling with batching and transportation / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid two-stage transportation and batch scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with job delivery coordination / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank

Latest revision as of 02:59, 5 July 2024

scientific article
Language Label Description Also known as
English
Realistic two-stage flowshop batch scheduling problems with transportation capacity and times
scientific article

    Statements

    Realistic two-stage flowshop batch scheduling problems with transportation capacity and times (English)
    0 references
    0 references
    0 references
    0 references
    21 April 2012
    0 references
    0 references
    flowshop
    0 references
    transportation
    0 references
    batch processing machine
    0 references
    lower bound
    0 references
    heuristic
    0 references
    0 references