Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates (Q421585): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(5 intermediate revisions by 5 users not shown)
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B30 / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B05 / rank
 
Normal rank
Property / zbMATH DE Number
 
Property / zbMATH DE Number: 6035046 / rank
 
Normal rank
Property / zbMATH Keywords
 
manufacturing
Property / zbMATH Keywords: manufacturing / rank
 
Normal rank
Property / zbMATH Keywords
 
queuing
Property / zbMATH Keywords: queuing / rank
 
Normal rank
Property / zbMATH Keywords
 
inventory
Property / zbMATH Keywords: inventory / rank
 
Normal rank
Property / zbMATH Keywords
 
investment analysis
Property / zbMATH Keywords: investment analysis / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2011.03.006 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2054151117 / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q57517573 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An analytical model for service level and tardiness in a single machine MTO production system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simultaneous Capacity and Production Management of Short-Life-Cycle, Produce-to-Stock Goods Under Stochastic Demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: Planning order releases for an assembly system with random operation times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Managing Capacity and Inventory Jointly in Manufacturing Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: On a Congestion Problem in an Aircraft Factory / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some Inequalities for Parallel-Server Queues / rank
 
Normal rank
Property / cites work
 
Property / cites work: Design of manufacturing systems using queueing models / rank
 
Normal rank
Property / cites work
 
Property / cites work: Safety Stock versus Safety Time in MRP Controlled Production Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Several Results on the Design of Queueing Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Classified Bibliography of Research on Optimal Design and Control of Queues / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Application of Queueing Theory to Reservation Newtorks / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Leadtimes Planning in a Serial Production System / rank
 
Normal rank
Property / cites work
 
Property / cites work: Customer-Order Information, Leadtimes, and Inventories / rank
 
Normal rank
Property / cites work
 
Property / cites work: Setting WIP levels with statistical throughput control (STC) in CONWIP production lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Trade-off between capacity invested and inventory needed / rank
 
Normal rank
Property / cites work
 
Property / cites work: The value of advance demand information in production/inventory systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the tradeoff between optimal order-base-stock levels and demand lead-times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-server, Finite Waiting Room,<i>M/G/c/K</i>Optimization Models / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated capacity and inventory management with capacity acquisition lead times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Letter to the Editor—The Output of an <i>M</i>/<i>G</i>/∞ Queuing System is Poisson / rank
 
Normal rank
Property / cites work
 
Property / cites work: Necessary and Sufficient Conditions for Delay Moments in FIFO Multiserver Queues with an Application Comparing s Slow Servers with One Fast One / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the Optimality of Single-Server Queuing Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analysis, Design, and Control of Queueing Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: The effect of foreknowledge of demand in case of a restricted capacity: the single-stage, single-product case / rank
 
Normal rank
Property / cites work
 
Property / cites work: Advance demand information and a restricted production capacity: on the optimality of order base-stock policies / rank
 
Normal rank
Property / cites work
 
Property / cites work: Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 05:49, 5 July 2024

scientific article
Language Label Description Also known as
English
Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates
scientific article

    Statements

    Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates (English)
    0 references
    0 references
    0 references
    14 May 2012
    0 references
    0 references
    manufacturing
    0 references
    queuing
    0 references
    inventory
    0 references
    investment analysis
    0 references
    0 references
    0 references