The strong NP-hardness of the maximum lateness minimization scheduling problem with the processing-time based aging effect (Q422898): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.amc.2011.12.020 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2044644161 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A correlation and heuristic approach for obtaining production sequences requiring a minimum of tool replacements / rank
 
Normal rank
Property / cites work
 
Property / cites work: A concise survey of scheduling with time-dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine group scheduling problems with deteriorated and learning effect / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deterioration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling with deteriorating functions for job processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling jobs under an aging effect / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenance / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-agent scheduling with position-based deteriorating jobs and learning effects / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on scheduling on a single processor with speed dependent on a number of executed jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the makespan in a single-machine scheduling problem with the cyclic process of an aging effect / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on scheduling deteriorating jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling problems with both start-time dependent learning and position dependent aging effects under deteriorating maintenance consideration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling with general job-dependent aging effect and maintenance activities to minimize makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling models with deterioration and learning: Handling precedence constraints via priority generation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling with a nonlinear deterioration function / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine group scheduling with a time-dependent learning effect / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling problems with general effects of deterioration and learning / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some single-machine and flowshop scheduling problems with a non-linear deterioration function / rank
 
Normal rank
Property / cites work
 
Property / cites work: The strong NP-hardness of the maximum lateness minimization scheduling problem with the processing-time based aging effect / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the total completion time in single-machine scheduling with aging/deteriorating effects and deteriorating maintenance activities / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine Scheduling Problems with Aging/Deteriorating Effect under an Optional Maintenance Activity Consideration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling and slack due-date assignment with aging effect and deteriorating maintenance / rank
 
Normal rank

Latest revision as of 05:15, 5 July 2024

scientific article
Language Label Description Also known as
English
The strong NP-hardness of the maximum lateness minimization scheduling problem with the processing-time based aging effect
scientific article

    Statements

    The strong NP-hardness of the maximum lateness minimization scheduling problem with the processing-time based aging effect (English)
    0 references
    0 references
    18 May 2012
    0 references
    scheduling
    0 references
    deteriorating
    0 references
    aging effect
    0 references
    computational complexity
    0 references
    0 references

    Identifiers