A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock (Q1761198): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2012.01.002 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2016851500 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling inbound and outbound trucks at cross docking terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the makespan in a two-machine cross-docking flow shop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan in two-stage hybrid cross docking scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Crossdocking—JIT scheduling with time windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: Crossdocking— Just in Time scheduling: an alternative solution approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Truck Dock Assignment Problem with Time Windows and Capacity Constraint in Transshipment Network Through Crossdocks / rank
 
Normal rank
Property / cites work
 
Property / cites work: Truck dock assignment problem with operational time constraint within crossdocks / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Effects of Trailer Scheduling on the Layout of Freight Terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: Depth-First Search and Linear Graph Algorithms / rank
 
Normal rank

Latest revision as of 21:46, 5 July 2024

scientific article
Language Label Description Also known as
English
A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock
scientific article

    Statements

    A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    15 November 2012
    0 references
    0 references
    0 references
    0 references
    0 references
    crossdocking
    0 references
    truck scheduling
    0 references
    practicality
    0 references
    feasibility
    0 references
    heuristics
    0 references
    0 references