Scheduling linear deteriorating jobs to minimize the number of tardy jobs (Q693149): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10898-011-9767-1 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2063888542 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing maximum lateness under linear deterioration / rank
 
Normal rank
Property / cites work
 
Property / cites work: The complexity of scheduling starting time dependent tasks with release times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling jobs under simple linear deterioration / rank
 
Normal rank
Property / cites work
 
Property / cites work: A concise survey of scheduling with time-dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling linear deteriorating jobs to minimize makespan with an availability constraint on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling linear deteriorating jobs with an availability constraint on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling Deteriorating Jobs on a Single Processor / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling jobs with position-dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the total weighted completion time of deteriorating jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling with logarithm deterioration / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel-machine scheduling under potential disruption / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the weighted number of tardy jobs on a single machine with release dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: An exact method to minimize the number of tardy jobs in single machine scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the weighted number of tardy jobs on a two-machine flow shop. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the weighted number of tardy jobs on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complex Scheduling / rank
 
Normal rank

Latest revision as of 23:56, 5 July 2024

scientific article
Language Label Description Also known as
English
Scheduling linear deteriorating jobs to minimize the number of tardy jobs
scientific article

    Statements

    Scheduling linear deteriorating jobs to minimize the number of tardy jobs (English)
    0 references
    0 references
    0 references
    7 December 2012
    0 references
    0 references
    linear deteriorating jobs
    0 references
    branch and bound
    0 references
    number of tardy jobs
    0 references
    0 references