A novel two-phase group decision making approach for construction project selection in a fuzzy environment (Q693549): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.apm.2011.11.050 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1966601769 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Group decision making based on novel fuzzy modified TOPSIS method / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4823197 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The concept of a linguistic variable and its application to approximate reasoning. I / rank
 
Normal rank
Property / cites work
 
Property / cites work: The concept of a linguistic variable and its application to approximate reasoning. II / rank
 
Normal rank
Property / cites work
 
Property / cites work: The concept of a linguistic variable and its application to approximate reasoning. III / rank
 
Normal rank
Property / cites work
 
Property / cites work: An approach to ordinal decision making / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy sets and systems. Theory and applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: A procedure for ordering fuzzy subsets of the unit interval / rank
 
Normal rank
Property / cites work
 
Property / cites work: A ratio scale metric and the compatibility of ratio scales: The possibility of Arrow's impossibility theorem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3044280 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Diagnosis with Dependent Symptoms: Bayes Theorem and the Analytic Hierarchy Process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4485695 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Exam scheduling: mathematical modeling and parameter estimation with the analytic network process approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: A novel hybrid decision-making model for selecting locations in a fuzzy environment / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simple method to improve the consistency ratio of the pair-wise comparison matrix in ANP / rank
 
Normal rank
Property / cites work
 
Property / cites work: An effective Markov based approach for calculating the limit matrix in the analytic network process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analytic network process in risk assessment and decision analysis / rank
 
Normal rank
Property / cites work
 
Property / cites work: Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiple attribute decision making. Methods and applications. A state-of- the-art survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy multiple attribute decision making. Methods and applications. In collaboration with Frank P. Hwang / rank
 
Normal rank
Property / cites work
 
Property / cites work: A fuzzy grey model based on the compromise ranking for multi-criteria group decision making problems in manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Extension of VIKOR method for decision making problem with interval numbers / rank
 
Normal rank
Property / cites work
 
Property / cites work: Developing new products in a network with efficiency and innovation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4606219 / rank
 
Normal rank

Latest revision as of 00:05, 6 July 2024

scientific article
Language Label Description Also known as
English
A novel two-phase group decision making approach for construction project selection in a fuzzy environment
scientific article

    Statements

    A novel two-phase group decision making approach for construction project selection in a fuzzy environment (English)
    0 references
    0 references
    7 December 2012
    0 references
    0 references
    group decision making
    0 references
    fuzzy sets
    0 references
    uncertainty and risk
    0 references
    ANP
    0 references
    VIKOR
    0 references
    construction project selection
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references