Proportionate flowshops with general position-dependent processing times (Q1944066): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ipl.2010.11.016 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2021266030 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling jobs with position-dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling with learning considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bi-criteria two-machine flowshop scheduling problem with a learning effect / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling with learning effect considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for two bottleneck optimization problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3417375 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The learning effect: getting to the core of the problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine and two-machine flowshop scheduling with general learning functions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complexity results for single-machine scheduling with positional learning effects / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling problems with a learning effect / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with general job-dependent learning curves. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Focused Scheduling in Proportionate Flowshops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3212909 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3525910 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on scheduling problems with learning effect and deteriorating jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4828381 / rank
 
Normal rank

Latest revision as of 07:37, 6 July 2024

scientific article
Language Label Description Also known as
English
Proportionate flowshops with general position-dependent processing times
scientific article

    Statements

    Proportionate flowshops with general position-dependent processing times (English)
    0 references
    0 references
    4 April 2013
    0 references
    scheduling
    0 references
    proportionate flowshop
    0 references
    makespan
    0 references
    position-dependent processing times
    0 references

    Identifiers