Mixed integer programming in production planning with backlogging and setup carryover: modeling and algorithms (Q2393142): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(4 intermediate revisions by 3 users not shown)
Property / describes a project that uses
 
Property / describes a project that uses: MULTILSB / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: bc-prod / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2013790936 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic approach for big bucket multi-level production planning problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Neighbourhood search meta-heuristics for capacitated lot-sizing with sequence-dependent setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Strong Formulations for Multi-Item Capacitated Lot Sizing / rank
 
Normal rank
Property / cites work
 
Property / cites work: bc — prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5287175 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solution approaches for the soft drink integrated production lot sizing and scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Single-Product Lot-Sizing Problem with Constant Parameters and Backlogging: Exact Results, a New Solution, and All Parameter Stability Regions / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Tabu-Search Heuristic for the Capacitated Lot-Sizing Problem with Set-up Carryover / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over / rank
 
Normal rank
Property / cites work
 
Property / cites work: Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4139966 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Uncapacitated lot sizing with backlogging: the convex hull / rank
 
Normal rank
Property / cites work
 
Property / cites work: Linear-programming extended formulations for the single-item lot-sizing problem with backlogging and constant capacity / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tight Mip Formulation for Multi-Item Discrete Lot-Sizing Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot-size models with backlogging: Strong reformulations and cutting planes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving Multi-Item Lot-Sizing Problems Using Strong Cutting Planes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling multiple stage manufacturing systems with generalized costs and capacity issues / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single item lot-sizing problems with backlogging on a single machine at a finite production rate / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Capacitated Lot-Sizing Problem with Linked Lot Sizes / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic for the dynamic multi-level capacitated lotsizing problem with linked lotsizes for general product structures / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging / rank
 
Normal rank
Property / cites work
 
Property / cites work: An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times / rank
 
Normal rank

Latest revision as of 18:16, 6 July 2024

scientific article
Language Label Description Also known as
English
Mixed integer programming in production planning with backlogging and setup carryover: modeling and algorithms
scientific article

    Statements

    Mixed integer programming in production planning with backlogging and setup carryover: modeling and algorithms (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    7 August 2013
    0 references
    0 references
    lot sizing
    0 references
    setup carryover
    0 references
    backlogging
    0 references
    progressive time-oriented decomposition heuristic
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references