Primary-secondary bicriteria scheduling on identical machines to minimize the total completion time of all jobs and the maximum T-time of all machines (Q391787): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.tcs.2013.05.034 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2079725842 / rank
 
Normal rank
Property / cites work
 
Property / cites work: How good are SPT schedules for fair optimality criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3425131 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complexity of single machine, multi-criteria scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on a scheduling problem with dual criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-Machine Scheduling to Minimize a Function of Two or Three Maximum Cost Criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multicriteria scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on the extension of a result on scheduling with secondary criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing Schedule Length Subject to Minimum Flow Time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Preemptive scheduling with two minimax criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling to minimize the maximum total completion time per machine / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 05:55, 7 July 2024

scientific article
Language Label Description Also known as
English
Primary-secondary bicriteria scheduling on identical machines to minimize the total completion time of all jobs and the maximum T-time of all machines
scientific article

    Statements

    Primary-secondary bicriteria scheduling on identical machines to minimize the total completion time of all jobs and the maximum T-time of all machines (English)
    0 references
    0 references
    0 references
    0 references
    13 January 2014
    0 references
    bicriteria scheduling
    0 references
    identical machines
    0 references
    total completion time
    0 references
    worst-case ratio
    0 references

    Identifiers