A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (Q2434282): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10951-010-0173-1 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2026886654 / rank
 
Normal rank
Property / cites work
 
Property / cites work: On solutions of fuzzy random multiobjective quadratic programming with applications in portfolio problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Executing production schedules in the face of uncertainties: a review and some future directions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Constraint-based scheduling: Applying constraint programming to scheduling problems. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A theoretic and practical framework for scheduling in a stochastic environment / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4826104 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch and bound algorithm for the resource-constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained project scheduling: Notation, classification, models, and methods / rank
 
Normal rank
Property / cites work
 
Property / cites work: An effective hybrid algorithm for university course timetabling / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the formalization of fuzzy random variables / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for multiprocessor scheduling with two job lengths and allocation restrictions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling of Project Networks by Job Assignment / rank
 
Normal rank
Property / cites work
 
Property / cites work: A single-period inventory model with fuzzy random variable demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: On a singular point in the Newtonian theory of hypersonic flow / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Overview on the development of fuzzy random variables / rank
 
Normal rank
Property / cites work
 
Property / cites work: Job-shop resource scheduling via simulating random operations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project scheduling under uncertainty: survey and research potentials / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4079017 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine, scheduling problem with fuzzy precedence relation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling parallel jobs to minimize the makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy random variables - I. Definitions and theorems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy random variables - II. Algorithms and examples for the discrete case / rank
 
Normal rank
Property / cites work
 
Property / cites work: A class of multiobjective linear programming model with fuzzy random coefficients / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multicriteria heuristic method to improve resource allocation in multiproject scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiple objective programming problems with possibilistic coefficients / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5312889 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3591374 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project scheduling with inventory constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3525911 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with batching: A review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Using fuzzy set theory in a scheduling problem: A case study / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy random variables / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new fuzzy time-series model of fuzzy number observations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal planning in large multi-site production networks / rank
 
Normal rank
Property / cites work
 
Property / cites work: A competitive heuristic solution technique for resource-constrained project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Constrained multi-project planning problems: A Lagrangean decomposition approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy random renewal reward process and its applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy random renewal process with queueing applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-objective decision making model under fuzzy random environment and its application to inventory problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy sets / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy sets as a basis for a theory of possibility / rank
 
Normal rank
Property / cites work
 
Property / cites work: A two-stage stochastic programming approach for project planning with uncertain activity durations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy programming and linear programming with several objective functions / rank
 
Normal rank

Latest revision as of 08:31, 7 July 2024

scientific article
Language Label Description Also known as
English
A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project
scientific article

    Statements

    A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project (English)
    0 references
    0 references
    0 references
    5 February 2014
    0 references
    0 references
    0 references
    0 references
    0 references
    multiple project scheduling
    0 references
    resource-constrained
    0 references
    multiple objective
    0 references
    fuzzy random variable
    0 references
    hybrid genetic algorithm
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references