On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time (Q2434291): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10951-011-0260-y / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1992519595 / rank
 
Normal rank
Property / cites work
 
Property / cites work: On-line integrated production-distribution scheduling problems with capacitated deliveries / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with job delivery coordination / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated Production and Outbound Distribution Scheduling: Review and Extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated Scheduling of Production and Distribution Operations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Supply Chain Scheduling: Batching and Delivery / rank
 
Normal rank
Property / cites work
 
Property / cites work: Jackson's Rule for Single-Machine Scheduling: Making a Good Heuristic Better / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Best Possible Deterministic On-Line Algorithm for Minimizing Maximum Delivery Time on a Single Machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with transportation considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Unbounded parallel batch scheduling with job delivery to minimize makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: SINGLE MACHINE SCHEDULING WITH JOB DELIVERY TO MINIMIZE MAKESPAN / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling with release dates and job delivery to minimize the makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed / rank
 
Normal rank
Property / cites work
 
Property / cites work: Restarts can help in the on-line minimization of the maximum delivery time on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: On-line algorithms for minimizing makespan on batch processing machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: On-line two-machine job shop scheduling with time lags / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production and distribution scheduling with committed delivery dates / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 08:31, 7 July 2024

scientific article
Language Label Description Also known as
English
On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time
scientific article

    Statements

    On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time (English)
    0 references
    0 references
    5 February 2014
    0 references
    0 references
    0 references
    0 references
    0 references
    scheduling
    0 references
    on-line algorithm
    0 references
    competitive ratio
    0 references
    0 references